Reliable Transfers, Competitive Edge

Offshore Wind Power Vessel

Vessels

Enerwind Ocean's fleet is customized to meet the needs of our customers, providing vessels with optimal stability, speed and cargo capacity according to the characteristics of the wind farm. To ensure a safe and reliable operating system, we have obtained certifications for safety and health management system (ISO 45001), quality management system (ISO 9001), and environmental management system (ISO 14001).
EWO-CTV1(EWO-1412-WD)
As the first CTV in South Korea and the first model of Enerwind Ocean's CTV, it is a monumental vessel that has been with the offshore wind industry since its beginning. Operating in the Tamra Offshore Wind Farm and Jeonnam Offshore Wind Farm, it has proven its reliability in the transportation of personnel and equipment, a fundamental role for a CTV.
  • Project sites : Tamra Offshore Windfarm, Jeonnam 1 Offshore Windfarm
  • Overall length : 16.6m
  • Gross tonnage : 22tons
  • Maximum speed : 25knots
  • Number of passengers : 12
EWO-CTV2(EWO-2020-WD)
Based on the operational experience of EWO-CTV1, this next-generation CTV model has been developed by improving the shortcomings and maximizing the advantages. With a larger cargo space and improved speed, it supports faster and more efficient offshore wind farm operations. It has been operating in offshore wind farms in the Southwest Sea since 2019 and has been performing reliable work in offshore wind farms in the Southwest Sea.
  • Project sites : Southwest Offshore Windfarm
  • Overall length : 19.56m
  • Gross tonnage : 31tons
  • Maximum speed : 30knots
  • Number of passengers : 20
EWO-CTV3(EWO-0712-GT)
Specialized for close-to-shore operations, this high-speed CTV is optimized for the Tamra offshore wind farm, where maintenance personnel need to be moved quickly over short distances. The compact yet powerful propulsion and flexible maneuverability of the design allows for safe and efficient operation in tight areas.
  • Project sites : Tamra Offshore Windfarm
  • Overall length : 11m
  • Gross tonnage : 5.6tons
  • Maximum speed : 40knots
  • Number of passengers : 12
EWO-CTV4(EWO-2021-WD)
EWO's strategic model is a feature-rich CTV for mooring offshore wind turbines. Equipped with dedicated fenders, cranes for loading and unloading cargo, and interceptors for smooth operation, it provides optimized performance not only for transporting maintenance personnel but also for transporting cargo and equipment. It is currently operating at the Hallim Offshore Wind Farm, demonstrating both high speed and stability, and is a practical and economical vessel.
  • Project sites : Hallim Offshore Windfarm
  • Overall length : 19.7m
  • Gross tonnage : 51tons
  • Maximum speed : 30knots
  • Number of passengers : 21